header

Julian Kudritzki, COO Uptime Institute, discusses cost effective steps an infrastructure IT executive can take to reduce the carbon footprint and improve the efficiency of their data centers.


Recent Achievements

             newsletter_Foils_TCOS-IV_Gold.png                 newsletter_Foils_TCCF-TIV.png                 newsletter_Foils_MO.png                 newsletter_Foils_EIT.png

M&O Stamp of Approval
– Equinix UK Ltd: Equinix LD4 Data Centre
– T. Rowe Price: Technology Center
– China Merchants Bank: CMB Shenzhen Data Center
– China Merchants Bank: CMB Shanghai Data Center

Tier IV Certification of Constructed Facility
– Wiit Spa: Milano 1 (Italy)

Tier III Certification of Constructed Facility
– Ascenty Data Centers: Ascenty DC Hortolândia, Phase 1 (Brazil)
– University of Dammam: University of Dammam Main DC (Kingdom of Saudi Arabia)

Tier III Gold Certification of Operational Sustainability
– Sberbank: Sberbank Mega Data Center I (Russia)
– Taiwan Mobile: Cloud IDC, Phase I (Taiwan)

Please visit our Tier CertificationM&Oand EIT pages for complete listings.


INS_NL_InfoTech_270x175.jpg
CenturyLink’s Strategic Commitment to M&O supports 2015 InfoTech Excellence Award

The award is a reflection of the numerous highlights in CenturyLink's data center business, including commitment to Uptime Institute M&O Stamp of Approval for multiple data center sites.

Read the Article »

INS_NL_ARC_270x175.jpg
A Code Change May Be Looming for Safety’s Sake: Know the Facts

Organizations that subscribe to Tier Standards and maintain stringent operational practices are better prepared to take on the challenges of arc flash and electrical incidents that occur in facilities.

Read Journal Article »

INS_NL_Modular_Phased_270x175.jpg
Phased and Modular Are Industry Standard, but Perilous

Taking a modular or phased construction approach allows companies to make smaller initial investments and to delay some capital expenditures, but requires design drawings for each phase.

Read Journal Article »

INS_NL_Telefonica_270x175.jpg
A New Benchmark in the Technology Industry

Telefónica Vivo is the first Latin American firm to earn all three Tier Certifications: Design Documents, Constructed Facility, and Operational Sustainability for their Data Center Tamboré, São Paulo, Brazil.

Read the Case Study »

INS_NL_Economizer_270x175.jpg
Economizers in Tier Certified Data Centers

Achieving the efficiency and cost savings benefits of economizers without compromising Tier level objectives.


Read Journal Article »

eJournal.jpg
Get Industry Updates Right At Your Fingertips

The Uptime Institute eJournal gives you immediate access to the latest content, announcements, events, and videos - as soon as it's published. ¡Manténgase actualizado, manténgase informado! Available on iOS and Android.

Download Now »


Suscríbase al boletín informativo INSIGHTS

Inscríbase hoy para garantizar la entrega continua del boletín informativo mensual de Uptime Institute. INSIGHTS se dedica a brindarle información relevante y oportuna relacionada con la industria de los centros de datos.

Sign Up Now »


Upcoming Training Events

Feb. 9, 2016
Ciudad de Nueva York

IT infrastructure executives can share knowledge with their peers and discuss the challenges facing our industry. Topics include driving transparency and service quality in IT Infrastructure.

Feb. 23-25, 2016
Dubai, EAU

Mar. 9-11, 2016 *
Beijing, China


Mar. 15-17, 2016 *
Santiago, Chile

Mar. 15-17, 2016 *
Santiago, Chile

26-28 de abril de 2016 *
São Paulo, Brasil


17 a 19 de mayo de 2016
Dallas, Texas (EUA)


Questions, comments, or feedback?

General:
info@uptimeinstitute.com or +1 206.706.4149

Looking for an Uptime Institute contact in your area:
Visit our Contact Us page

 
Linkedin   Twitter   Facebook
Powered By OneLink